1
/
of
1
AECOM
Practical Ways the Water Sector Can Improve Resilience while Cutting Carbon
Practical Ways the Water Sector Can Improve Resilience while Cutting Carbon
Couldn't load pickup availability
The water sector faces a paradox: cutting capital and operational carbon while at the same time maintaining performance standards in the face of a changing climate. In this course, we examine practical ways that the water sector can address the challenge.
By the end of this course, you should be able to:
- Understand the importance of assessing the carbon impact of infrastructure projects and considering the need for infrastructure early in the planning process
- Identify the scale of potential carbon impact and determine if infrastructure projects are essential or if the scope can be reduced