Skip to product information
1 of 1

B1M

Delivering HS2 with BIM

Delivering HS2 with BIM

We've decided to bet the shop on building information modelling (BIM) - Join Professor Andrew McNaughton, Technical Director of High-Speed Two (HS2), for a look at how BIM is shaping the design, delivery, operation and maintenance of Britain's latest high-speed railway.

After studying this course, you should be able to:-

  1. Apply some of the practical tips to your next projects
  2. Avoid some of the common pitfalls highlighted
View full details