APC Competencies – Inclusive Environments by Jen Lemen
In this article, we look at five key topics relevant to the Inclusive Environments competency. This is a level 1 mandatory competency on all pathways, so it is essential reading for RICS APC candidates.
What is an inclusive environment?
In their Essential Principles guide, the Construction Industry Council (CIC) define an inclusive environment as ‘one that can be accessed and used safely, easily and with dignity by everyone’, ‘does not physically or socially segregate, discriminate or isolate’ and ‘is well designed, functional, efficient and sustainable, and delivers an enhanced user experience’.
What is inclusive design?
In the CABE guide, ‘The Principles of Inclusive Design’, inclusive design is defined as ‘making places everyone can use’. This removes barriers creating undue effort and separation, enabling all users to ‘participate equally, confidently and independently in everyday environments’.
What are the key principles of inclusive design?
The CIC set out five key principles for inclusive design:
- Placing people at the heart of the design process
- Acknowledging diversity and difference
- Offering choice where a single solution cannot accommodate all users
- Providing flexibility in use
- Creating an environment that is convenient and enjoyable for all to use
How can inclusive design be achieved?
In this article, we are going to consider five key topics relating to inclusive environments and design:
- Equality Act 2010
- National Planning Policy Framework (NPPF)
- Approved Document M
- British Standard BS 8300
- Changing Places campaign
What does the Equality Act 2010 say about inclusive environments?
The Equality Act 2010 replaced the Disability Discrimination Acts of 1995 and 2005. Section 20 states that disabled individuals should not face barriers to access premises. If a barrier is faced and the disabled individual is put at a substantial disadvantage in relation to a non-disabled individual, then the service provider is under an obligation to make reasonable adjustments to facilitate access.
This extends beyond the duty just to facilitate physical access, e.g. through ramps or lift access. It also relates to the way in which services are provided, which could include auxiliary aids such as hearing loops or visual aids.
Reasonable adjustments can be made through changing the way that things are done, changing physical features or providing additional aids or services.
You can read more about reasonable adjustments here.
What does the NPPF say about inclusive environments?
Section 8 of the latest NPPF relates to the provision of healthy, inclusive and safe places. These should ‘promote health and well-being, with a high standard of amenity for existing and future users’. This emphasises that high quality, inclusive design is a key principle of sustainable development, going beyond just aesthetic factors.
What is Approved Document M of the Building Regulations?
Approved Document M relates to the ‘ease of access to, and use of, buildings, including facilities for disabled visitors or occupants, and the ability to move through a building easily including to toilets and bathrooms’. It is split into Volume 1 Dwellings and Volume 2 Buildings other than Dwellings.
You can read the full guidance in Approved Document M here.
What is BS 8300?
BS 8300 was introduced in 2018, split into two parts; Part 1 BS 8300-1:2018 and Part 2 BS 8300-2:2018. BS 8300 goes beyond the minimum requirements set out in the Approved Document Part M.
Part 1 provides guidance relating to the accessible and inclusive design of new public spaces. Part 2 relates to internal design to meet all user requirements. It does not apply to individual residential dwellings.
The guidance relates to issues such as lighting external areas, ramp gradients and rises, accessible viewing for audience seating, sanitary facilities, WC layout and baby change facilities.
You can access the full guidance on the BSI website.
What is the Changing Places campaign?
The Changing Places campaign was launched in 2006 by the Changing Places Consortium. It aims to provide toilet facilities which are safe, comfortable and accessible for those who cannot use standard accessible toilets.
Changing Places toilets will have adequate space and facilities, e.g. height adjustable changing benches and hoists, to meet a variety of user requirements. Research suggests that over 250,000 people in the UK would benefit from the provision of Changing Places toilets, including users living with motor neurone disease, multiple sclerosis and cerebral palsy.
How can I learn more?
We highly recommend checking out the free CPD module (1 hour) offered by the Design Council, which can be accessed here. The Design Council also offer an extensive Resource Hub online.
Training budgets: an investment in capability, consistency and cost control
A training budget should not be seen only as a cost to control. Used well, it is an investment in reducing risk, improving consistency and building the capability people need to perform effectively. For organisations managing complex projects and contracts, targeted learning can reduce avoidable mistakes, strengthen business knowledge and address capability gaps before they become costly. A strong training budget directs investment towards the capability gaps that create the greatest operational and commercial risk. Why training investment matters Without the right training, employees can lose time searching for answers, repeating work, or escalating issues that could have been handled earlier. In contract management, knowledge gaps can also increase the risk of missed obligations,...
Continuous learning: an investment that can reduce business costs
In construction and contract management, knowledge gaps can quickly become expensive. Missed notices, poor record-keeping, misunderstood contract obligations and inconsistent processes can lead to delays, rework, disputes and avoidable risk. Continuous learning helps teams keep their knowledge current, apply it confidently and make better decisions before small issues become costly problems. A strong continuous-learning programme is more than occasional training. It gives people access to relevant, practical learning, supports them with expert guidance, and helps organisations track development so capability improves over time. Four ways continuous learning can save money 1. Reduce avoidable errors and rework When employees understand contract requirements, commercial processes...
NEC Contract Guide: NEC Contracts Explained
Table of contents What is NEC? Types of NEC Contracts NEC4 Options Explained Key roles & responsibilities Common NEC mistakes by first-time users First 90 days checklist NEC is a family of standard form contracts widely used on UK construction and infrastructure projects. NEC4 is the latest generation of the suite. For anyone working under one for the first time, the language and structure take some getting used to. This guide sets out what that means in practice: how NEC4 differs from NEC3, what the main contract types and options are for, and what to get right in the first few weeks so the contract works the way it's designed to. What is an NEC Contract? The New Engineering Contract, or NEC, is not one single contract but a family of standard contracts used...