{"name":"Built Intelligence","description":"Built Intelligence","url":"https:\/\/builtintelligence.com","home":"https:\/\/builtintelligence.com","gmt_offset":"0","timezone_string":"","page_for_posts":0,"page_on_front":8,"show_on_front":"page","namespaces":["oembed\/1.0","wpe\/cache-plugin\/v1","wpe_sign_on_plugin\/v1","code-snippets\/v1","divi-ajax-filter\/v1","de\/v1","redirection\/v1","yoast\/v1","complianz\/v1","divi\/v1","omapp\/v1","wp\/v2","wp-site-health\/v1","wp-block-editor\/v1","wp-abilities\/v1"],"authentication":{"application-passwords":{"endpoints":{"authorization":"https:\/\/builtintelligence.com\/wp-admin\/authorize-application.php"}}},"routes":{"\/":{"namespace":"","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/"}]}},"\/batch\/v1":{"namespace":"","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"validation":{"type":"string","enum":["require-all-validate","normal"],"default":"normal","required":false},"requests":{"type":"array","maxItems":25,"items":{"type":"object","properties":{"method":{"type":"string","enum":["POST","PUT","PATCH","DELETE"],"default":"POST"},"path":{"type":"string","required":true},"body":{"type":"object","properties":[],"additionalProperties":true},"headers":{"type":"object","properties":[],"additionalProperties":{"type":["string","array"],"items":{"type":"string"}}}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/batch\/v1"}]}},"\/oembed\/1.0":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"oembed\/1.0","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/oembed\/1.0"}]}},"\/oembed\/1.0\/embed":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"The URL of the resource for which to fetch oEmbed data.","type":"string","format":"uri","required":true},"format":{"default":"json","required":false},"maxwidth":{"default":600,"required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/oembed\/1.0\/embed"}]}},"\/oembed\/1.0\/proxy":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"The URL of the resource for which to fetch oEmbed data.","type":"string","format":"uri","required":true},"format":{"description":"The oEmbed format to use.","type":"string","default":"json","enum":["json","xml"],"required":false},"maxwidth":{"description":"The maximum width of the embed frame in pixels.","type":"integer","default":600,"required":false},"maxheight":{"description":"The maximum height of the embed frame in pixels.","type":"integer","required":false},"discover":{"description":"Whether to perform an oEmbed discovery request for unsanctioned providers.","type":"boolean","default":true,"required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/oembed\/1.0\/proxy"}]}},"\/wpe\/cache-plugin\/v1":{"namespace":"wpe\/cache-plugin\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wpe\/cache-plugin\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wpe\/cache-plugin\/v1"}]}},"\/wpe\/cache-plugin\/v1\/clear_all_caches":{"namespace":"wpe\/cache-plugin\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wpe\/cache-plugin\/v1\/clear_all_caches"}]}},"\/wpe\/cache-plugin\/v1\/rate_limit_status":{"namespace":"wpe\/cache-plugin\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wpe\/cache-plugin\/v1\/rate_limit_status"}]}},"\/wpe_sign_on_plugin\/v1":{"namespace":"wpe_sign_on_plugin\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wpe_sign_on_plugin\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wpe_sign_on_plugin\/v1"}]}},"\/wpe_sign_on_plugin\/v1\/login":{"namespace":"wpe_sign_on_plugin\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wpe_sign_on_plugin\/v1\/login"}]}},"\/wpe_sign_on_plugin\/v1\/is_user_logged_in":{"namespace":"wpe_sign_on_plugin\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wpe_sign_on_plugin\/v1\/is_user_logged_in"}]}},"\/wpe_sign_on_plugin\/v1\/has_logged":{"namespace":"wpe_sign_on_plugin\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wpe_sign_on_plugin\/v1\/has_logged"}]}},"\/code-snippets\/v1":{"namespace":"code-snippets\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"code-snippets\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/code-snippets\/v1"}]}},"\/code-snippets\/v1\/snippets":{"namespace":"code-snippets\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false}}},{"methods":["POST"],"args":{"name":{"description":"Descriptive title for the snippet.","type":"string","required":false},"desc":{"description":"Descriptive text associated with snippet.","type":"string","required":false},"code":{"description":"Executable snippet code.","type":"string","required":false},"tags":{"description":"List of tag categories the snippet belongs to.","type":"array","items":{"type":"string"},"required":false},"scope":{"description":"Context in which the snippet is executable.","type":"string","required":false},"condition_id":{"description":"Identifier of condition linked to this snippet.","type":"integer","required":false},"active":{"description":"Snippet activation status.","type":"boolean","required":false},"priority":{"description":"Relative priority in which the snippet is executed.","type":"integer","required":false},"network":{"description":"Whether the snippet is network-wide instead of site-wide.","type":["boolean","null"],"required":false},"shared_network":{"description":"If a network snippet, whether can be activated on discrete sites instead of network-wide.","type":["boolean","null"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/code-snippets\/v1\/snippets"}]}},"\/code-snippets\/v1\/snippets\/(?P<id>[\\d]+)":{"namespace":"code-snippets\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"name":{"description":"Descriptive title for the snippet.","type":"string","required":false},"desc":{"description":"Descriptive text associated with snippet.","type":"string","required":false},"code":{"description":"Executable snippet code.","type":"string","required":false},"tags":{"description":"List of tag categories the snippet belongs to.","type":"array","items":{"type":"string"},"required":false},"scope":{"description":"Context in which the snippet is executable.","type":"string","required":false},"condition_id":{"description":"Identifier of condition linked to this snippet.","type":"integer","required":false},"active":{"description":"Snippet activation status.","type":"boolean","required":false},"priority":{"description":"Relative priority in which the snippet is executed.","type":"integer","required":false},"network":{"description":"Whether the snippet is network-wide instead of site-wide.","type":["boolean","null"],"required":false},"shared_network":{"description":"If a network snippet, whether can be activated on discrete sites instead of network-wide.","type":["boolean","null"],"required":false}}},{"methods":["DELETE"],"args":[]}]},"\/code-snippets\/v1\/snippets\/schema":{"namespace":"code-snippets\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/code-snippets\/v1\/snippets\/schema"}]}},"\/code-snippets\/v1\/snippets\/(?P<id>[\\d]+)\/activate":{"namespace":"code-snippets\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}]},"\/code-snippets\/v1\/snippets\/(?P<id>[\\d]+)\/deactivate":{"namespace":"code-snippets\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}]},"\/code-snippets\/v1\/snippets\/(?P<id>[\\d]+)\/export":{"namespace":"code-snippets\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/code-snippets\/v1\/snippets\/(?P<id>[\\d]+)\/export-code":{"namespace":"code-snippets\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/divi-ajax-filter\/v1":{"namespace":"divi-ajax-filter\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"divi-ajax-filter\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/divi-ajax-filter\/v1"}]}},"\/divi-ajax-filter\/v1\/filter":{"namespace":"divi-ajax-filter\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/divi-ajax-filter\/v1\/filter"}]}},"\/divi-ajax-filter\/v1\/get_count":{"namespace":"divi-ajax-filter\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/divi-ajax-filter\/v1\/get_count"}]}},"\/divi-ajax-filter\/v1\/loadmore":{"namespace":"divi-ajax-filter\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/divi-ajax-filter\/v1\/loadmore"}]}},"\/divi-ajax-filter\/v1\/sub_category":{"namespace":"divi-ajax-filter\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/divi-ajax-filter\/v1\/sub_category"}]}},"\/divi-ajax-filter\/v1\/post-loop-query":{"namespace":"divi-ajax-filter\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/divi-ajax-filter\/v1\/post-loop-query"}]}},"\/divi-ajax-filter\/v1\/get-archive-posts":{"namespace":"divi-ajax-filter\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/divi-ajax-filter\/v1\/get-archive-posts"}]}},"\/divi-ajax-filter\/v1\/get-authors":{"namespace":"divi-ajax-filter\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/divi-ajax-filter\/v1\/get-authors"}]}},"\/divi-ajax-filter\/v1\/get-posts":{"namespace":"divi-ajax-filter\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/divi-ajax-filter\/v1\/get-posts"}]}},"\/divi-ajax-filter\/v1\/get-filter-options":{"namespace":"divi-ajax-filter\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/divi-ajax-filter\/v1\/get-filter-options"}]}},"\/divi-ajax-filter\/v1\/get-product-attributes":{"namespace":"divi-ajax-filter\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/divi-ajax-filter\/v1\/get-product-attributes"}]}},"\/divi-ajax-filter\/v1\/get-filter-chosen":{"namespace":"divi-ajax-filter\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/divi-ajax-filter\/v1\/get-filter-chosen"}]}},"\/divi-ajax-filter\/v1\/post-title":{"namespace":"divi-ajax-filter\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/divi-ajax-filter\/v1\/post-title"}]}},"\/divi-ajax-filter\/v1\/get-thumbnail-sizes":{"namespace":"divi-ajax-filter\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/divi-ajax-filter\/v1\/get-thumbnail-sizes"}]}},"\/divi-ajax-filter\/v1\/get-thumbnail-preview":{"namespace":"divi-ajax-filter\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/divi-ajax-filter\/v1\/get-thumbnail-preview"}]}},"\/divi-ajax-filter\/v1\/get-acf-fields":{"namespace":"divi-ajax-filter\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/divi-ajax-filter\/v1\/get-acf-fields"}]}},"\/divi-ajax-filter\/v1\/get-categories":{"namespace":"divi-ajax-filter\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/divi-ajax-filter\/v1\/get-categories"}]}},"\/divi-ajax-filter\/v1\/get-custom-loop-layout":{"namespace":"divi-ajax-filter\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/divi-ajax-filter\/v1\/get-custom-loop-layout"}]}},"\/divi-ajax-filter\/v1\/get-custom-loop-templates":{"namespace":"divi-ajax-filter\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/divi-ajax-filter\/v1\/get-custom-loop-templates"}]}},"\/divi-ajax-filter\/v1\/get-divi-layouts":{"namespace":"divi-ajax-filter\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/divi-ajax-filter\/v1\/get-divi-layouts"}]}},"\/divi-ajax-filter\/v1\/get-loop-shortcode-template":{"namespace":"divi-ajax-filter\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/divi-ajax-filter\/v1\/get-loop-shortcode-template"}]}},"\/divi-ajax-filter\/v1\/get-loop-templates-custom-template":{"namespace":"divi-ajax-filter\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/divi-ajax-filter\/v1\/get-loop-templates-custom-template"}]}},"\/divi-ajax-filter\/v1\/get-loop-templates":{"namespace":"divi-ajax-filter\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/divi-ajax-filter\/v1\/get-loop-templates"}]}},"\/divi-ajax-filter\/v1\/get-post-types":{"namespace":"divi-ajax-filter\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/divi-ajax-filter\/v1\/get-post-types"}]}},"\/divi-ajax-filter\/v1\/get-taxonomy":{"namespace":"divi-ajax-filter\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"post_type":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/divi-ajax-filter\/v1\/get-taxonomy"}]}},"\/divi-ajax-filter\/v1\/get-products":{"namespace":"divi-ajax-filter\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/divi-ajax-filter\/v1\/get-products"}]}},"\/divi-ajax-filter\/v1\/get-saved-types":{"namespace":"divi-ajax-filter\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/divi-ajax-filter\/v1\/get-saved-types"}]}},"\/divi-ajax-filter\/v1\/get-tags":{"namespace":"divi-ajax-filter\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/divi-ajax-filter\/v1\/get-tags"}]}},"\/divi-ajax-filter\/v1\/get-taxonomies-checkbox":{"namespace":"divi-ajax-filter\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/divi-ajax-filter\/v1\/get-taxonomies-checkbox"}]}},"\/divi-ajax-filter\/v1\/get-taxonomies":{"namespace":"divi-ajax-filter\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/divi-ajax-filter\/v1\/get-taxonomies"}]}},"\/divi-ajax-filter\/v1\/get-taxonomy-terms":{"namespace":"divi-ajax-filter\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/divi-ajax-filter\/v1\/get-taxonomy-terms"}]}},"\/de\/v1":{"namespace":"de\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"de\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/de\/v1"}]}},"\/de\/v1\/clear-cache":{"namespace":"de\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/de\/v1\/clear-cache"}]}},"\/de\/v1\/check-connection":{"namespace":"de\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"daf_cache_type":{"type":"string","required":true},"daf_cache_ip":{"type":"string","default":"","required":false},"daf_cache_port":{"type":"integer","default":0,"required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/de\/v1\/check-connection"}]}},"\/redirection\/v1":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"redirection\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/redirection\/v1"}]}},"\/redirection\/v1\/redirect":{"namespace":"redirection\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["source","last_count","last_access","position","id",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["source","last_count","last_access","position","id",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/redirection\/v1\/redirect"}]}},"\/redirection\/v1\/redirect\/(?P<id>[\\d]+)":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}]},"\/redirection\/v1\/redirect\/post":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"text":{"description":"Text to match","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/redirection\/v1\/redirect\/post"}]}},"\/redirection\/v1\/bulk\/redirect\/(?P<bulk>delete|enable|disable|reset)":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["source","last_count","last_access","position","id",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false},"global":{"description":"Apply bulk action globally, as per filters","type":"boolean","required":false},"items":{"description":"Array of IDs to perform action on","type":"array","items":{"description":"Item ID","type":["string","number"]},"required":false}}}]},"\/redirection\/v1\/group":{"namespace":"redirection\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["name","id",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["name","id",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false},"moduleId":{"description":"Module ID","type":"integer","minimum":0,"maximum":3,"required":true},"name":{"description":"Group name","type":"string","required":true},"status":{"description":"Status of the group","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/redirection\/v1\/group"}]}},"\/redirection\/v1\/group\/(?P<id>[\\d]+)":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"moduleId":{"description":"Module ID","type":"integer","minimum":0,"maximum":3,"required":true},"name":{"description":"Group name","type":"string","required":true},"status":{"description":"Status of the group","required":false}}}]},"\/redirection\/v1\/bulk\/group\/(?P<bulk>delete|enable|disable)":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["name","id",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false},"items":{"description":"Comma separated list of item IDs to perform action on","type":"array","items":{"description":"Item ID","type":["string","number"]},"required":false}}}]},"\/redirection\/v1\/log":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["url","ip","total","count",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/redirection\/v1\/log"}]}},"\/redirection\/v1\/bulk\/log\/(?P<bulk>delete)":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["url","ip","total","count",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false},"items":{"description":"Comma separated list of item IDs to perform action on","type":"array","items":{"description":"Item ID","type":["string","number"]},"required":false}}}]},"\/redirection\/v1\/404":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["url","ip","total","count",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/redirection\/v1\/404"}]}},"\/redirection\/v1\/bulk\/404\/(?P<bulk>delete)":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["url","ip","total","count",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false},"items":{"description":"Comma separated list of item IDs to perform action on","type":"array","items":{"description":"Item ID","type":["string","number"]},"required":false}}}]},"\/redirection\/v1\/setting":{"namespace":"redirection\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/redirection\/v1\/setting"}]}},"\/redirection\/v1\/plugin":{"namespace":"redirection\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"name":{"description":"Name","type":"string","required":false},"value":{"description":"Value","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/redirection\/v1\/plugin"}]}},"\/redirection\/v1\/plugin\/delete":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/redirection\/v1\/plugin\/delete"}]}},"\/redirection\/v1\/plugin\/test":{"namespace":"redirection\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/redirection\/v1\/plugin\/test"}]}},"\/redirection\/v1\/plugin\/data":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"upgrade":{"description":"Upgrade parameter","type":"string","enum":["stop","skip","retry"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/redirection\/v1\/plugin\/data"}]}},"\/redirection\/v1\/import\/file\/(?P<group_id>\\d+)":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}]},"\/redirection\/v1\/import\/plugin":{"namespace":"redirection\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/redirection\/v1\/import\/plugin"}]}},"\/redirection\/v1\/export\/(?P<module>1|2|3|all)\/(?P<format>csv|apache|nginx|json)":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/yoast\/v1":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"yoast\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1"}]}},"\/yoast\/v1\/file_size":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"type":"string","description":"The url to retrieve","required":true}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/file_size"}]}},"\/yoast\/v1\/statistics":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/statistics"}]}},"\/yoast\/v1\/ai_generator\/callback":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"access_jwt":{"type":"string","description":"The access JWT.","required":true},"refresh_jwt":{"type":"string","description":"The JWT to be used when the access JWT needs to be refreshed.","required":true},"code_challenge":{"type":"string","description":"The SHA266 of the verification code used to check the authenticity of a callback call.","required":true},"user_id":{"type":"integer","description":"The id of the user associated to the code verifier.","required":true}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/ai_generator\/callback"}]}},"\/yoast\/v1\/ai_generator\/refresh_callback":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"access_jwt":{"type":"string","description":"The access JWT.","required":true},"refresh_jwt":{"type":"string","description":"The JWT to be used when the access JWT needs to be refreshed.","required":true},"code_challenge":{"type":"string","description":"The SHA266 of the verification code used to check the authenticity of a callback call.","required":true},"user_id":{"type":"integer","description":"The id of the user associated to the code verifier.","required":true}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/ai_generator\/refresh_callback"}]}},"\/yoast\/v1\/ai_generator\/consent":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"consent":{"type":"boolean","description":"Whether the consent to use AI-based services has been given by the user.","required":true}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/ai_generator\/consent"}]}},"\/yoast\/v1\/ai\/free_sparks":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/ai\/free_sparks"}]}},"\/yoast\/v1\/ai_generator\/bust_subscription_cache":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/ai_generator\/bust_subscription_cache"}]}},"\/yoast\/v1\/ai_generator\/get_suggestions":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"type":{"type":"string","enum":["seo-title","meta-description","product-seo-title","product-meta-description","product-taxonomy-seo-title","product-taxonomy-meta-description","taxonomy-seo-title","taxonomy-meta-description"],"description":"The type of suggestion requested.","required":true},"prompt_content":{"type":"string","description":"The content needed by the prompt to ask for suggestions.","required":true},"focus_keyphrase":{"type":"string","description":"The focus keyphrase associated to the post.","required":true},"language":{"type":"string","description":"The language the post is written in.","required":true},"platform":{"type":"string","enum":["Google","Facebook","Twitter"],"description":"The platform the post is intended for.","required":true},"editor":{"type":"string","enum":["classic","elementor","gutenberg"],"description":"The current editor.","required":true}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/ai_generator\/get_suggestions"}]}},"\/yoast\/v1\/ai_generator\/get_usage":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"is_woo_product_entity":{"type":"boolean","default":false,"required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/ai_generator\/get_usage"}]}},"\/yoast\/v1\/new-content-type-visibility\/dismiss-post-type":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"postTypeName":{"required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/new-content-type-visibility\/dismiss-post-type"}]}},"\/yoast\/v1\/new-content-type-visibility\/dismiss-taxonomy":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"taxonomyName":{"required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/new-content-type-visibility\/dismiss-taxonomy"}]}},"\/yoast\/v1\/readability_scores":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"contentType":{"type":"string","required":true},"taxonomy":{"type":"string","default":"","required":false},"term":{"type":"integer","default":null,"required":false},"troubleshooting":{"type":"bool","default":null,"required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/readability_scores"}]}},"\/yoast\/v1\/seo_scores":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"contentType":{"type":"string","required":true},"taxonomy":{"type":"string","default":"","required":false},"term":{"type":"integer","default":null,"required":false},"troubleshooting":{"type":"bool","default":null,"required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/seo_scores"}]}},"\/yoast\/v1\/introductions\/(?P<introduction_id>[\\w-]+)\/seen":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"introduction_id":{"type":"string","required":true},"is_seen":{"type":"bool","default":true,"required":false}}}]},"\/yoast\/v1\/wistia_embed_permission":{"namespace":"yoast\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":{"value":{"type":"bool","default":true,"required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/wistia_embed_permission"}]}},"\/yoast\/v1\/available_posts":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"search":{"type":"string","default":"","required":false},"postType":{"type":"string","default":"page","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/available_posts"}]}},"\/yoast\/v1\/alerts\/dismiss":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"key":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/alerts\/dismiss"}]}},"\/yoast\/v1\/configuration\/site_representation":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"company_or_person":{"type":"string","enum":["company","person"],"required":true},"company_name":{"type":"string","required":false},"company_logo":{"type":"string","required":false},"company_logo_id":{"type":"integer","required":false},"person_logo":{"type":"string","required":false},"person_logo_id":{"type":"integer","required":false},"company_or_person_user_id":{"type":"integer","required":false},"description":{"type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/configuration\/site_representation"}]}},"\/yoast\/v1\/configuration\/social_profiles":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"facebook_site":{"type":"string","required":false},"twitter_site":{"type":"string","required":false},"other_social_urls":{"type":"array","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/configuration\/social_profiles"}]}},"\/yoast\/v1\/configuration\/check_capability":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"user_id":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/configuration\/check_capability"}]}},"\/yoast\/v1\/configuration\/enable_tracking":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"tracking":{"type":"boolean","required":true}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/configuration\/enable_tracking"}]}},"\/yoast\/v1\/configuration\/save_configuration_state":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"finishedSteps":{"type":"array","required":true}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/configuration\/save_configuration_state"}]}},"\/yoast\/v1\/configuration\/get_configuration_state":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/configuration\/get_configuration_state"}]}},"\/yoast\/v1\/import\/(?P<plugin>[\\w-]+)\/(?P<type>[\\w-]+)":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/yoast\/v1\/get_head":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/get_head"}]}},"\/yoast\/v1\/indexing\/posts":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/indexing\/posts"}]}},"\/yoast\/v1\/indexing\/terms":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/indexing\/terms"}]}},"\/yoast\/v1\/indexing\/post-type-archives":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/indexing\/post-type-archives"}]}},"\/yoast\/v1\/indexing\/general":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/indexing\/general"}]}},"\/yoast\/v1\/indexing\/prepare":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/indexing\/prepare"}]}},"\/yoast\/v1\/indexing\/indexables-complete":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/indexing\/indexables-complete"}]}},"\/yoast\/v1\/indexing\/complete":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/indexing\/complete"}]}},"\/yoast\/v1\/link-indexing\/posts":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/link-indexing\/posts"}]}},"\/yoast\/v1\/link-indexing\/terms":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/link-indexing\/terms"}]}},"\/yoast\/v1\/integrations\/set_active":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"active":{"type":"boolean","required":true},"integration":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/integrations\/set_active"}]}},"\/yoast\/v1\/meta\/search":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/meta\/search"}]}},"\/yoast\/v1\/semrush\/authenticate":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"code":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/semrush\/authenticate"}]}},"\/yoast\/v1\/semrush\/country_code":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"country_code":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/semrush\/country_code"}]}},"\/yoast\/v1\/semrush\/related_keyphrases":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"keyphrase":{"required":true},"country_code":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/semrush\/related_keyphrases"}]}},"\/yoast\/v1\/wincher\/authorization-url":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/wincher\/authorization-url"}]}},"\/yoast\/v1\/wincher\/authenticate":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"code":{"required":true},"websiteId":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/wincher\/authenticate"}]}},"\/yoast\/v1\/wincher\/keyphrases\/track":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"keyphrases":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/wincher\/keyphrases\/track"}]}},"\/yoast\/v1\/wincher\/keyphrases":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"keyphrases":{"required":false},"permalink":{"required":false},"startAt":{"required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/wincher\/keyphrases"}]}},"\/yoast\/v1\/wincher\/keyphrases\/untrack":{"namespace":"yoast\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/wincher\/keyphrases\/untrack"}]}},"\/yoast\/v1\/wincher\/account\/limit":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/wincher\/account\/limit"}]}},"\/yoast\/v1\/wincher\/account\/upgrade-campaign":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/wincher\/account\/upgrade-campaign"}]}},"\/yoast\/v1\/workouts":{"namespace":"yoast\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/yoast\/v1\/workouts"}]}},"\/complianz\/v1":{"namespace":"complianz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"complianz\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/complianz\/v1"}]}},"\/complianz\/v1\/documents":{"namespace":"complianz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/complianz\/v1\/documents"}]}},"\/complianz\/v1\/banner":{"namespace":"complianz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/complianz\/v1\/banner"}]}},"\/complianz\/v1\/track":{"namespace":"complianz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/complianz\/v1\/track"}]}},"\/complianz\/v1\/manage_consent_html":{"namespace":"complianz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/complianz\/v1\/manage_consent_html"}]}},"\/complianz\/v1\/store_cookies":{"namespace":"complianz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/complianz\/v1\/store_cookies"}]}},"\/complianz\/v1\/consent-area\/(?P<post_id>([0-9]+))\/(?P<block_id>([a-z0-9-_]+))":{"namespace":"complianz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/complianz\/v1\/datarequests":{"namespace":"complianz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/complianz\/v1\/datarequests"}]}},"\/complianz\/v1\/cookie_data":{"namespace":"complianz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/complianz\/v1\/cookie_data"}]}},"\/complianz\/v1\/wsc-scan":{"namespace":"complianz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/complianz\/v1\/wsc-scan"}]}},"\/complianz\/v1\/wsc-checks":{"namespace":"complianz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/complianz\/v1\/wsc-checks"}]}},"\/de\/v1\/product-categories":{"namespace":"de\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/de\/v1\/product-categories"}]}},"\/de\/v1\/incomplete-achievements":{"namespace":"de\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/de\/v1\/incomplete-achievements"}]}},"\/de\/v1\/completed-achievements":{"namespace":"de\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/de\/v1\/completed-achievements"}]}},"\/de\/v1\/validate-license":{"namespace":"de\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/de\/v1\/validate-license"}]}},"\/de\/v1\/deactivate-license":{"namespace":"de\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/de\/v1\/deactivate-license"}]}},"\/de\/v1\/get-licenses":{"namespace":"de\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/de\/v1\/get-licenses"}]}},"\/de\/v1\/settings\/(?P<plugin>[a-z0-9\\-]+)":{"namespace":"de\/v1","methods":["GET","PUT"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["PUT"],"args":[]}]},"\/divi\/v1":{"namespace":"divi\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"divi\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/divi\/v1"}]}},"\/divi\/v1\/get_layout_content":{"namespace":"divi\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"required":false},"nonce":{"required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/divi\/v1\/get_layout_content"}]}},"\/divi\/v1\/block\/layout\/builder_edit_data":{"namespace":"divi\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"action":{"required":false},"postId":{"required":false},"blockId":{"required":false},"layoutContent":{"required":false},"nonce":{"required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/divi\/v1\/block\/layout\/builder_edit_data"}]}},"\/omapp\/v1":{"namespace":"omapp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"omapp\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/omapp\/v1"}]}},"\/omapp\/v1\/info":{"namespace":"omapp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/omapp\/v1\/info"}]}},"\/omapp\/v1\/support":{"namespace":"omapp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/omapp\/v1\/support"}]}},"\/omapp\/v1\/support\/debug\/enable":{"namespace":"omapp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/omapp\/v1\/support\/debug\/enable"}]}},"\/omapp\/v1\/support\/debug\/disable":{"namespace":"omapp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/omapp\/v1\/support\/debug\/disable"}]}},"\/omapp\/v1\/me":{"namespace":"omapp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/omapp\/v1\/me"}]}},"\/omapp\/v1\/campaigns\/refresh":{"namespace":"omapp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/omapp\/v1\/campaigns\/refresh"}]}},"\/omapp\/v1\/campaigns\/(?P<id>\\w+)":{"namespace":"omapp\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}]},"\/omapp\/v1\/campaigns\/(?P<id>[\\w-]+)\/sync":{"namespace":"omapp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/omapp\/v1\/resources":{"namespace":"omapp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/omapp\/v1\/resources"}]}},"\/omapp\/v1\/notifications":{"namespace":"omapp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/omapp\/v1\/notifications"}]}},"\/omapp\/v1\/notifications\/dismiss":{"namespace":"omapp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/omapp\/v1\/notifications\/dismiss"}]}},"\/omapp\/v1\/notifications\/create":{"namespace":"omapp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/omapp\/v1\/notifications\/create"}]}},"\/omapp\/v1\/plugins":{"namespace":"omapp\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/omapp\/v1\/plugins"}]}},"\/omapp\/v1\/api":{"namespace":"omapp\/v1","methods":["POST","DELETE"],"endpoints":[{"methods":["POST"],"args":[]},{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/omapp\/v1\/api"}]}},"\/omapp\/v1\/settings":{"namespace":"omapp\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/omapp\/v1\/settings"}]}},"\/omapp\/v1\/review\/dismiss":{"namespace":"omapp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/omapp\/v1\/review\/dismiss"}]}},"\/omapp\/v1\/omu\/courses":{"namespace":"omapp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/omapp\/v1\/omu\/courses"}]}},"\/omapp\/v1\/omu\/guides":{"namespace":"omapp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/omapp\/v1\/omu\/guides"}]}},"\/omapp\/v1\/account\/sync":{"namespace":"omapp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/omapp\/v1\/account\/sync"}]}},"\/omapp\/v1\/account\/connect":{"namespace":"omapp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/omapp\/v1\/account\/connect"}]}},"\/wp\/v2":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp\/v2","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2"}]}},"\/wp\/v2\/posts":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","wpra_emergency","wpra_alert","wpra_critical","wpra_error","wpra_warning","wpra_notice","wpra_info","wpra_debug","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"categories":{"description":"Limit result set to items with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"categories_exclude":{"description":"Limit result set to items except those with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"tags":{"description":"Limit result set to items with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tags_exclude":{"description":"Limit result set to items except those with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"sticky":{"description":"Limit result set to items that are sticky.","type":"boolean","required":false},"ignore_sticky":{"description":"Whether to ignore sticky posts or not.","type":"boolean","default":true,"required":false},"format":{"description":"Limit result set to items assigned one or more given formats.","type":"array","uniqueItems":true,"items":{"enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","wpra_emergency","wpra_alert","wpra_critical","wpra_error","wpra_warning","wpra_notice","wpra_info","wpra_debug"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_et_pb_use_builder":{"type":"string","title":"","description":"","default":""},"_et_pb_old_content":{"type":"string","title":"","description":"","default":""},"_et_gb_content_width":{"type":"string","title":"","description":"","default":""},"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"sticky":{"description":"Whether or not the post should be treated as sticky.","type":"boolean","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/posts"}]}},"\/wp\/v2\/posts\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","wpra_emergency","wpra_alert","wpra_critical","wpra_error","wpra_warning","wpra_notice","wpra_info","wpra_debug"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_et_pb_use_builder":{"type":"string","title":"","description":"","default":""},"_et_pb_old_content":{"type":"string","title":"","description":"","default":""},"_et_gb_content_width":{"type":"string","title":"","description":"","default":""},"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"sticky":{"description":"Whether or not the post should be treated as sticky.","type":"boolean","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/posts\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","wpra_emergency","wpra_alert","wpra_critical","wpra_error","wpra_warning","wpra_notice","wpra_info","wpra_debug"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_et_pb_use_builder":{"type":"string","title":"","description":"","default":""},"_et_pb_old_content":{"type":"string","title":"","description":"","default":""},"_et_gb_content_width":{"type":"string","title":"","description":"","default":""},"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"sticky":{"description":"Whether or not the post should be treated as sticky.","type":"boolean","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/pages":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"parent":{"description":"Limit result set to items with particular parent IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"parent_exclude":{"description":"Limit result set to all items except those of a particular parent ID.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","wpra_emergency","wpra_alert","wpra_critical","wpra_error","wpra_warning","wpra_notice","wpra_info","wpra_debug","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","wpra_emergency","wpra_alert","wpra_critical","wpra_error","wpra_warning","wpra_notice","wpra_info","wpra_debug"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_et_pb_use_builder":{"type":"string","title":"","description":"","default":""},"_et_pb_old_content":{"type":"string","title":"","description":"","default":""},"_et_gb_content_width":{"type":"string","title":"","description":"","default":""},"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/pages"}]}},"\/wp\/v2\/pages\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","wpra_emergency","wpra_alert","wpra_critical","wpra_error","wpra_warning","wpra_notice","wpra_info","wpra_debug"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_et_pb_use_builder":{"type":"string","title":"","description":"","default":""},"_et_pb_old_content":{"type":"string","title":"","description":"","default":""},"_et_gb_content_width":{"type":"string","title":"","description":"","default":""},"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/pages\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","wpra_emergency","wpra_alert","wpra_critical","wpra_error","wpra_warning","wpra_notice","wpra_info","wpra_debug"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_et_pb_use_builder":{"type":"string","title":"","description":"","default":""},"_et_pb_old_content":{"type":"string","title":"","description":"","default":""},"_et_gb_content_width":{"type":"string","title":"","description":"","default":""},"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/media":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"parent":{"description":"Limit result set to items with particular parent IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"parent_exclude":{"description":"Limit result set to all items except those of a particular parent ID.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"inherit","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["inherit","private","trash"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"gallery_categories":{"description":"Limit result set to items with specific terms assigned in the gallery_categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"gallery_categories_exclude":{"description":"Limit result set to items except those with specific terms assigned in the gallery_categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"media_type":{"default":null,"description":"Limit result set to attachments of a particular media type or media types.","type":"array","items":{"type":"string","enum":["image","video","text","application","audio"]},"required":false},"mime_type":{"default":null,"description":"Limit result set to attachments of a particular MIME type or MIME types.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","wpra_emergency","wpra_alert","wpra_critical","wpra_error","wpra_warning","wpra_notice","wpra_info","wpra_debug"],"required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_et_pb_use_builder":{"type":"string","title":"","description":"","default":""},"_et_pb_old_content":{"type":"string","title":"","description":"","default":""},"_et_gb_content_width":{"type":"string","title":"","description":"","default":""},"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"gallery_categories":{"description":"The terms assigned to the post in the gallery_categories taxonomy.","type":"array","items":{"type":"integer"},"required":false},"alt_text":{"description":"Alternative text to display when attachment is not displayed.","type":"string","required":false},"caption":{"description":"The attachment caption.","type":"object","properties":{"raw":{"description":"Caption for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML caption for the attachment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"The attachment description.","type":"object","properties":{"raw":{"description":"Description for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML description for the attachment, transformed for display.","type":"string","context":["view","edit"],"readonly":true}},"required":false},"post":{"description":"The ID for the associated post of the attachment.","type":"integer","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/media"}]}},"\/wp\/v2\/media\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","wpra_emergency","wpra_alert","wpra_critical","wpra_error","wpra_warning","wpra_notice","wpra_info","wpra_debug"],"required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_et_pb_use_builder":{"type":"string","title":"","description":"","default":""},"_et_pb_old_content":{"type":"string","title":"","description":"","default":""},"_et_gb_content_width":{"type":"string","title":"","description":"","default":""},"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"gallery_categories":{"description":"The terms assigned to the post in the gallery_categories taxonomy.","type":"array","items":{"type":"integer"},"required":false},"alt_text":{"description":"Alternative text to display when attachment is not displayed.","type":"string","required":false},"caption":{"description":"The attachment caption.","type":"object","properties":{"raw":{"description":"Caption for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML caption for the attachment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"The attachment description.","type":"object","properties":{"raw":{"description":"Description for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML description for the attachment, transformed for display.","type":"string","context":["view","edit"],"readonly":true}},"required":false},"post":{"description":"The ID for the associated post of the attachment.","type":"integer","required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/media\/(?P<id>[\\d]+)\/post-process":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"Unique identifier for the attachment.","type":"integer","required":false},"action":{"type":"string","enum":["create-image-subsizes"],"required":true}}}]},"\/wp\/v2\/media\/(?P<id>[\\d]+)\/edit":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"src":{"description":"URL to the edited image file.","type":"string","format":"uri","required":true},"modifiers":{"description":"Array of image edits.","type":"array","minItems":1,"items":{"description":"Image edit.","type":"object","required":["type","args"],"oneOf":[{"title":"Flip","properties":{"type":{"description":"Flip type.","type":"string","enum":["flip"]},"args":{"description":"Flip arguments.","type":"object","required":["flip"],"properties":{"flip":{"description":"Flip direction.","type":"object","required":["horizontal","vertical"],"properties":{"horizontal":{"description":"Whether to flip in the horizontal direction.","type":"boolean"},"vertical":{"description":"Whether to flip in the vertical direction.","type":"boolean"}}}}}}},{"title":"Rotation","properties":{"type":{"description":"Rotation type.","type":"string","enum":["rotate"]},"args":{"description":"Rotation arguments.","type":"object","required":["angle"],"properties":{"angle":{"description":"Angle to rotate clockwise in degrees.","type":"number"}}}}},{"title":"Crop","properties":{"type":{"description":"Crop type.","type":"string","enum":["crop"]},"args":{"description":"Crop arguments.","type":"object","required":["left","top","width","height"],"properties":{"left":{"description":"Horizontal position from the left to begin the crop as a percentage of the image width.","type":"number"},"top":{"description":"Vertical position from the top to begin the crop as a percentage of the image height.","type":"number"},"width":{"description":"Width of the crop as a percentage of the image width.","type":"number"},"height":{"description":"Height of the crop as a percentage of the image height.","type":"number"}}}}}]},"required":false},"rotation":{"description":"The amount to rotate the image clockwise in degrees. DEPRECATED: Use `modifiers` instead.","type":"integer","minimum":0,"exclusiveMinimum":true,"maximum":360,"exclusiveMaximum":true,"required":false},"x":{"description":"As a percentage of the image, the x position to start the crop from. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"y":{"description":"As a percentage of the image, the y position to start the crop from. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"width":{"description":"As a percentage of the image, the width to crop the image to. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"height":{"description":"As a percentage of the image, the height to crop the image to. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"caption":{"description":"The attachment caption.","type":"object","properties":{"raw":{"description":"Caption for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML caption for the attachment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"The attachment description.","type":"object","properties":{"raw":{"description":"Description for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML description for the attachment, transformed for display.","type":"string","context":["view","edit"],"readonly":true}},"required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"post":{"description":"The ID for the associated post of the attachment.","type":"integer","required":false},"alt_text":{"description":"Alternative text to display when attachment is not displayed.","type":"string","required":false}}}]},"\/wp\/v2\/menu-items":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":100,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"menu_order","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","wpra_emergency","wpra_alert","wpra_critical","wpra_error","wpra_warning","wpra_notice","wpra_info","wpra_debug","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"menus":{"description":"Limit result set to items with specific terms assigned in the menus taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"menus_exclude":{"description":"Limit result set to items except those with specific terms assigned in the menus taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"title":{"description":"The title for the object.","type":["string","object"],"properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"default":"custom","description":"The family of objects originally represented, such as \"post_type\" or \"taxonomy\".","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"default":"publish","description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private","wpra_emergency","wpra_alert","wpra_critical","wpra_error","wpra_warning","wpra_notice","wpra_info","wpra_debug"],"required":false},"parent":{"default":0,"description":"The ID for the parent of the object.","type":"integer","minimum":0,"required":false},"attr_title":{"description":"Text for the title attribute of the link element for this menu item.","type":"string","required":false},"classes":{"description":"Class names for the link element of this menu item.","type":"array","items":{"type":"string"},"required":false},"description":{"description":"The description of this menu item.","type":"string","required":false},"menu_order":{"default":1,"description":"The DB ID of the nav_menu_item that is this item's menu parent, if any, otherwise 0.","type":"integer","minimum":1,"required":false},"object":{"description":"The type of object originally represented, such as \"category\", \"post\", or \"attachment\".","type":"string","required":false},"object_id":{"default":0,"description":"The database ID of the original object this menu item represents, for example the ID for posts or the term_id for categories.","type":"integer","minimum":0,"required":false},"target":{"description":"The target attribute of the link element for this menu item.","type":"string","enum":["_blank",""],"required":false},"url":{"description":"The URL to which this menu item points.","type":"string","format":"uri","required":false},"xfn":{"description":"The XFN relationship expressed in the link of this menu item.","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"The terms assigned to the object in the nav_menu taxonomy.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_et_pb_use_builder":{"type":"string","title":"","description":"","default":""},"_et_pb_old_content":{"type":"string","title":"","description":"","default":""},"_et_gb_content_width":{"type":"string","title":"","description":"","default":""},"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false}},"required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/menu-items"}]}},"\/wp\/v2\/menu-items\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"title":{"description":"The title for the object.","type":["string","object"],"properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"description":"The family of objects originally represented, such as \"post_type\" or \"taxonomy\".","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private","wpra_emergency","wpra_alert","wpra_critical","wpra_error","wpra_warning","wpra_notice","wpra_info","wpra_debug"],"required":false},"parent":{"description":"The ID for the parent of the object.","type":"integer","minimum":0,"required":false},"attr_title":{"description":"Text for the title attribute of the link element for this menu item.","type":"string","required":false},"classes":{"description":"Class names for the link element of this menu item.","type":"array","items":{"type":"string"},"required":false},"description":{"description":"The description of this menu item.","type":"string","required":false},"menu_order":{"description":"The DB ID of the nav_menu_item that is this item's menu parent, if any, otherwise 0.","type":"integer","minimum":1,"required":false},"object":{"description":"The type of object originally represented, such as \"category\", \"post\", or \"attachment\".","type":"string","required":false},"object_id":{"description":"The database ID of the original object this menu item represents, for example the ID for posts or the term_id for categories.","type":"integer","minimum":0,"required":false},"target":{"description":"The target attribute of the link element for this menu item.","type":"string","enum":["_blank",""],"required":false},"url":{"description":"The URL to which this menu item points.","type":"string","format":"uri","required":false},"xfn":{"description":"The XFN relationship expressed in the link of this menu item.","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"The terms assigned to the object in the nav_menu taxonomy.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_et_pb_use_builder":{"type":"string","title":"","description":"","default":""},"_et_pb_old_content":{"type":"string","title":"","description":"","default":""},"_et_gb_content_width":{"type":"string","title":"","description":"","default":""},"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false}},"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/menu-items\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the object.","type":"integer","minimum":0,"required":false},"title":{"description":"The title for the object.","type":["string","object"],"properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"description":"The family of objects originally represented, such as \"post_type\" or \"taxonomy\".","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private","wpra_emergency","wpra_alert","wpra_critical","wpra_error","wpra_warning","wpra_notice","wpra_info","wpra_debug"],"required":false},"attr_title":{"description":"Text for the title attribute of the link element for this menu item.","type":"string","required":false},"classes":{"description":"Class names for the link element of this menu item.","type":"array","items":{"type":"string"},"required":false},"description":{"description":"The description of this menu item.","type":"string","required":false},"menu_order":{"description":"The DB ID of the nav_menu_item that is this item's menu parent, if any, otherwise 0.","type":"integer","minimum":1,"required":false},"object":{"description":"The type of object originally represented, such as \"category\", \"post\", or \"attachment\".","type":"string","required":false},"object_id":{"description":"The database ID of the original object this menu item represents, for example the ID for posts or the term_id for categories.","type":"integer","minimum":0,"required":false},"target":{"description":"The target attribute of the link element for this menu item.","type":"string","enum":["_blank",""],"required":false},"url":{"description":"The URL to which this menu item points.","type":"string","format":"uri","required":false},"xfn":{"description":"The XFN relationship expressed in the link of this menu item.","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"The terms assigned to the object in the nav_menu taxonomy.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_et_pb_use_builder":{"type":"string","title":"","description":"","default":""},"_et_pb_old_content":{"type":"string","title":"","description":"","default":""},"_et_gb_content_width":{"type":"string","title":"","description":"","default":""},"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false}},"required":false}}}]},"\/wp\/v2\/menu-items\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/blocks":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","wpra_emergency","wpra_alert","wpra_critical","wpra_error","wpra_warning","wpra_notice","wpra_info","wpra_debug","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"wp_pattern_category":{"description":"Limit result set to items with specific terms assigned in the wp_pattern_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"wp_pattern_category_exclude":{"description":"Limit result set to items except those with specific terms assigned in the wp_pattern_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","wpra_emergency","wpra_alert","wpra_critical","wpra_error","wpra_warning","wpra_notice","wpra_info","wpra_debug"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_et_pb_use_builder":{"type":"string","title":"","description":"","default":""},"_et_pb_old_content":{"type":"string","title":"","description":"","default":""},"_et_gb_content_width":{"type":"string","title":"","description":"","default":""},"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"wp_pattern_sync_status":{"type":"string","title":"","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wp_pattern_category":{"description":"The terms assigned to the post in the wp_pattern_category taxonomy.","type":"array","items":{"type":"integer"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/blocks"}]}},"\/wp\/v2\/blocks\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","wpra_emergency","wpra_alert","wpra_critical","wpra_error","wpra_warning","wpra_notice","wpra_info","wpra_debug"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_et_pb_use_builder":{"type":"string","title":"","description":"","default":""},"_et_pb_old_content":{"type":"string","title":"","description":"","default":""},"_et_gb_content_width":{"type":"string","title":"","description":"","default":""},"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"wp_pattern_sync_status":{"type":"string","title":"","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wp_pattern_category":{"description":"The terms assigned to the post in the wp_pattern_category taxonomy.","type":"array","items":{"type":"integer"},"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/blocks\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/blocks\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/blocks\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","wpra_emergency","wpra_alert","wpra_critical","wpra_error","wpra_warning","wpra_notice","wpra_info","wpra_debug"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_et_pb_use_builder":{"type":"string","title":"","description":"","default":""},"_et_pb_old_content":{"type":"string","title":"","description":"","default":""},"_et_gb_content_width":{"type":"string","title":"","description":"","default":""},"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"wp_pattern_sync_status":{"type":"string","title":"","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wp_pattern_category":{"description":"The terms assigned to the post in the wp_pattern_category taxonomy.","type":"array","items":{"type":"integer"},"required":false}}}]},"\/wp\/v2\/blocks\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/templates\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/templates\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/templates\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","wpra_emergency","wpra_alert","wpra_critical","wpra_error","wpra_warning","wpra_notice","wpra_info","wpra_debug"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false}}}]},"\/wp\/v2\/templates\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/templates":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wp_id":{"description":"Limit to the specified post id.","type":"integer","required":false},"area":{"description":"Limit to the specified template part area.","type":"string","required":false},"post_type":{"description":"Post type to get the templates for.","type":"string","required":false}}},{"methods":["POST"],"args":{"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":true},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"default":"","description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"default":"","description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"default":"","description":"Description of template.","type":"string","required":false},"status":{"default":"publish","description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","wpra_emergency","wpra_alert","wpra_critical","wpra_error","wpra_warning","wpra_notice","wpra_info","wpra_debug"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/templates"}]}},"\/wp\/v2\/templates\/lookup":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"The slug of the template to get the fallback for","type":"string","required":true},"is_custom":{"description":"Indicates if a template is custom or part of the template hierarchy","type":"boolean","required":false},"template_prefix":{"description":"The template prefix for the created template. This is used to extract the main template type, e.g. in `taxonomy-books` extracts the `taxonomy`","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/templates\/lookup"}]}},"\/wp\/v2\/templates\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","wpra_emergency","wpra_alert","wpra_critical","wpra_error","wpra_warning","wpra_notice","wpra_info","wpra_debug"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/template-parts\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/template-parts\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/template-parts\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","wpra_emergency","wpra_alert","wpra_critical","wpra_error","wpra_warning","wpra_notice","wpra_info","wpra_debug"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"area":{"description":"Where the template part is intended for use (header, footer, etc.)","type":"string","required":false}}}]},"\/wp\/v2\/template-parts\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/template-parts":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wp_id":{"description":"Limit to the specified post id.","type":"integer","required":false},"area":{"description":"Limit to the specified template part area.","type":"string","required":false},"post_type":{"description":"Post type to get the templates for.","type":"string","required":false}}},{"methods":["POST"],"args":{"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":true},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"default":"","description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"default":"","description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"default":"","description":"Description of template.","type":"string","required":false},"status":{"default":"publish","description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","wpra_emergency","wpra_alert","wpra_critical","wpra_error","wpra_warning","wpra_notice","wpra_info","wpra_debug"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"area":{"description":"Where the template part is intended for use (header, footer, etc.)","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/template-parts"}]}},"\/wp\/v2\/template-parts\/lookup":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"The slug of the template to get the fallback for","type":"string","required":true},"is_custom":{"description":"Indicates if a template is custom or part of the template hierarchy","type":"boolean","required":false},"template_prefix":{"description":"The template prefix for the created template. This is used to extract the main template type, e.g. in `taxonomy-books` extracts the `taxonomy`","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/template-parts\/lookup"}]}},"\/wp\/v2\/template-parts\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","wpra_emergency","wpra_alert","wpra_critical","wpra_error","wpra_warning","wpra_notice","wpra_info","wpra_debug"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"area":{"description":"Where the template part is intended for use (header, footer, etc.)","type":"string","required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/global-styles\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false}}}]},"\/wp\/v2\/global-styles\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the global styles revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the global styles revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/global-styles\/themes\/(?P<stylesheet>[\\\/\\s%\\w\\.\\(\\)\\[\\]\\@_\\-]+)\/variations":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":false},"args":{"stylesheet":{"description":"The theme identifier","type":"string","required":false}}}]},"\/wp\/v2\/global-styles\/themes\/(?P<stylesheet>[^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":false},"args":{"stylesheet":{"description":"The theme identifier","type":"string","required":false}}}]},"\/wp\/v2\/global-styles\/(?P<id>[\\\/\\d+]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":false},"args":{"id":{"description":"ID of global styles config.","type":"integer","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":false},"args":{"styles":{"description":"Global styles.","type":["object"],"required":false},"settings":{"description":"Global settings.","type":["object"],"required":false},"title":{"description":"Title of the global styles variation.","type":["object","string"],"properties":{"raw":{"description":"Title for the global styles variation, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false}}}]},"\/wp\/v2\/navigation":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","wpra_emergency","wpra_alert","wpra_critical","wpra_error","wpra_warning","wpra_notice","wpra_info","wpra_debug","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","wpra_emergency","wpra_alert","wpra_critical","wpra_error","wpra_warning","wpra_notice","wpra_info","wpra_debug"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/navigation"}]}},"\/wp\/v2\/navigation\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","wpra_emergency","wpra_alert","wpra_critical","wpra_error","wpra_warning","wpra_notice","wpra_info","wpra_debug"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/navigation\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/navigation\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/navigation\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","wpra_emergency","wpra_alert","wpra_critical","wpra_error","wpra_warning","wpra_notice","wpra_info","wpra_debug"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}]},"\/wp\/v2\/navigation\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/font-families":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"id","enum":["id","include"],"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"args":{"theme_json_version":{"description":"Version of the theme.json schema used for the typography settings.","type":"integer","default":3,"minimum":2,"maximum":3,"required":false},"font_family_settings":{"description":"font-family declaration in theme.json format, encoded as a string.","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/font-families"}]}},"\/wp\/v2\/font-families\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"theme_json_version":{"description":"Version of the theme.json schema used for the typography settings.","type":"integer","default":3,"minimum":2,"maximum":3,"required":false},"font_family_settings":{"description":"font-family declaration in theme.json format, encoded as a string.","type":"string","required":true}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/font-families\/(?P<font_family_id>[\\d]+)\/font-faces":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"id","enum":["id","include"],"required":false}}},{"methods":["POST"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"theme_json_version":{"description":"Version of the theme.json schema used for the typography settings.","type":"integer","default":3,"minimum":2,"maximum":3,"required":false},"font_face_settings":{"description":"font-face declaration in theme.json format, encoded as a string.","type":"string","required":true}}}]},"\/wp\/v2\/font-families\/(?P<font_family_id>[\\d]+)\/font-faces\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"id":{"description":"Unique identifier for the font face.","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"id":{"description":"Unique identifier for the font face.","type":"integer","required":true},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/project":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","wpra_emergency","wpra_alert","wpra_critical","wpra_error","wpra_warning","wpra_notice","wpra_info","wpra_debug","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"project_category":{"description":"Limit result set to items with specific terms assigned in the project_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"project_category_exclude":{"description":"Limit result set to items except those with specific terms assigned in the project_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"project_tag":{"description":"Limit result set to items with specific terms assigned in the project_tag taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"project_tag_exclude":{"description":"Limit result set to items except those with specific terms assigned in the project_tag taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","wpra_emergency","wpra_alert","wpra_critical","wpra_error","wpra_warning","wpra_notice","wpra_info","wpra_debug"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_et_pb_use_builder":{"type":"string","title":"","description":"","default":""},"_et_pb_old_content":{"type":"string","title":"","description":"","default":""},"_et_gb_content_width":{"type":"string","title":"","description":"","default":""},"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"project_category":{"description":"The terms assigned to the post in the project_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"project_tag":{"description":"The terms assigned to the post in the project_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/project"}]}},"\/wp\/v2\/project\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","wpra_emergency","wpra_alert","wpra_critical","wpra_error","wpra_warning","wpra_notice","wpra_info","wpra_debug"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_et_pb_use_builder":{"type":"string","title":"","description":"","default":""},"_et_pb_old_content":{"type":"string","title":"","description":"","default":""},"_et_gb_content_width":{"type":"string","title":"","description":"","default":""},"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"project_category":{"description":"The terms assigned to the post in the project_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"project_tag":{"description":"The terms assigned to the post in the project_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/project\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/project\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/project\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","wpra_emergency","wpra_alert","wpra_critical","wpra_error","wpra_warning","wpra_notice","wpra_info","wpra_debug"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_et_pb_use_builder":{"type":"string","title":"","description":"","default":""},"_et_pb_old_content":{"type":"string","title":"","description":"","default":""},"_et_gb_content_width":{"type":"string","title":"","description":"","default":""},"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"project_category":{"description":"The terms assigned to the post in the project_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"project_tag":{"description":"The terms assigned to the post in the project_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false}}}]},"\/wp\/v2\/project\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/wprss_feed_item":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","wpra_emergency","wpra_alert","wpra_critical","wpra_error","wpra_warning","wpra_notice","wpra_info","wpra_debug","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","wpra_emergency","wpra_alert","wpra_critical","wpra_error","wpra_warning","wpra_notice","wpra_info","wpra_debug"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_et_pb_use_builder":{"type":"string","title":"","description":"","default":""},"_et_pb_old_content":{"type":"string","title":"","description":"","default":""},"_et_gb_content_width":{"type":"string","title":"","description":"","default":""},"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/wprss_feed_item"}]}},"\/wp\/v2\/wprss_feed_item\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","wpra_emergency","wpra_alert","wpra_critical","wpra_error","wpra_warning","wpra_notice","wpra_info","wpra_debug"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_et_pb_use_builder":{"type":"string","title":"","description":"","default":""},"_et_pb_old_content":{"type":"string","title":"","description":"","default":""},"_et_gb_content_width":{"type":"string","title":"","description":"","default":""},"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/wprss_feed_item\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/wprss_feed_item\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/wprss_feed_item\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","wpra_emergency","wpra_alert","wpra_critical","wpra_error","wpra_warning","wpra_notice","wpra_info","wpra_debug"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_et_pb_use_builder":{"type":"string","title":"","description":"","default":""},"_et_pb_old_content":{"type":"string","title":"","description":"","default":""},"_et_gb_content_width":{"type":"string","title":"","description":"","default":""},"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}]},"\/wp\/v2\/wprss_feed_item\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/types"}]}},"\/wp\/v2\/types\/(?P<type>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"type":{"description":"An alphanumeric identifier for the post type.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/statuses":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/statuses"}]}},"\/wp\/v2\/statuses\/(?P<status>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"status":{"description":"An alphanumeric identifier for the status.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/taxonomies":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"type":{"description":"Limit results to taxonomies associated with a specific post type.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/taxonomies"}]}},"\/wp\/v2\/taxonomies\/(?P<taxonomy>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"taxonomy":{"description":"An alphanumeric identifier for the taxonomy.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/categories":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"parent":{"description":"Limit result set to terms assigned to a specific parent.","type":"integer","required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/categories"}]}},"\/wp\/v2\/categories\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/tags":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/tags"}]}},"\/wp\/v2\/tags\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/menus":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"locations":{"description":"The locations assigned to the menu.","type":"array","items":{"type":"string"},"required":false},"auto_add":{"description":"Whether to automatically add top level pages to this menu.","type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/menus"}]}},"\/wp\/v2\/menus\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"locations":{"description":"The locations assigned to the menu.","type":"array","items":{"type":"string"},"required":false},"auto_add":{"description":"Whether to automatically add top level pages to this menu.","type":"boolean","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/wp_pattern_category":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/wp_pattern_category"}]}},"\/wp\/v2\/wp_pattern_category\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/project_category":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"parent":{"description":"Limit result set to terms assigned to a specific parent.","type":"integer","required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/project_category"}]}},"\/wp\/v2\/project_category\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/project_tag":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/project_tag"}]}},"\/wp\/v2\/project_tag\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/gallery_categories":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"parent":{"description":"Limit result set to terms assigned to a specific parent.","type":"integer","required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/gallery_categories"}]}},"\/wp\/v2\/gallery_categories\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/users":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"default":"asc","description":"Order sort attribute ascending or descending.","enum":["asc","desc"],"type":"string","required":false},"orderby":{"default":"name","description":"Sort collection by user attribute.","enum":["id","include","name","registered_date","slug","include_slugs","email","url"],"type":"string","required":false},"slug":{"description":"Limit result set to users with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"roles":{"description":"Limit result set to users matching at least one specific role provided. Accepts csv list or single role.","type":"array","items":{"type":"string"},"required":false},"capabilities":{"description":"Limit result set to users matching at least one specific capability provided. Accepts csv list or single capability.","type":"array","items":{"type":"string"},"required":false},"who":{"description":"Limit result set to users who are considered authors.","type":"string","enum":["authors"],"required":false},"has_published_posts":{"description":"Limit result set to users who have published posts.","type":["boolean","array"],"items":{"type":"string","enum":{"post":"post","page":"page","attachment":"attachment","nav_menu_item":"nav_menu_item","wp_block":"wp_block","wp_template":"wp_template","wp_template_part":"wp_template_part","wp_global_styles":"wp_global_styles","wp_navigation":"wp_navigation","wp_font_family":"wp_font_family","wp_font_face":"wp_font_face","project":"project","wprss_feed_item":"wprss_feed_item"}},"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["email","name","id","username","slug"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"username":{"description":"Login name for the user.","type":"string","required":true},"name":{"description":"Display name for the user.","type":"string","required":false},"first_name":{"description":"First name for the user.","type":"string","required":false},"last_name":{"description":"Last name for the user.","type":"string","required":false},"email":{"description":"The email address for the user.","type":"string","format":"email","required":true},"url":{"description":"URL of the user.","type":"string","format":"uri","required":false},"description":{"description":"Description of the user.","type":"string","required":false},"locale":{"description":"Locale for the user.","type":"string","enum":["","en_US"],"required":false},"nickname":{"description":"The nickname for the user.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the user.","type":"string","required":false},"roles":{"description":"Roles assigned to the user.","type":"array","items":{"type":"string"},"required":false},"password":{"description":"Password for the user (never included).","type":"string","required":true},"meta":{"description":"Meta fields.","type":"object","properties":{"persisted_preferences":{"type":"object","title":"","description":"","default":[],"context":["edit"],"properties":{"_modified":{"description":"The date and time the preferences were updated.","type":"string","format":"date-time","readonly":false}},"additionalProperties":true}},"required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/users"}]}},"\/wp\/v2\/users\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the user.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the user.","type":"integer","required":false},"username":{"description":"Login name for the user.","type":"string","required":false},"name":{"description":"Display name for the user.","type":"string","required":false},"first_name":{"description":"First name for the user.","type":"string","required":false},"last_name":{"description":"Last name for the user.","type":"string","required":false},"email":{"description":"The email address for the user.","type":"string","format":"email","required":false},"url":{"description":"URL of the user.","type":"string","format":"uri","required":false},"description":{"description":"Description of the user.","type":"string","required":false},"locale":{"description":"Locale for the user.","type":"string","enum":["","en_US"],"required":false},"nickname":{"description":"The nickname for the user.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the user.","type":"string","required":false},"roles":{"description":"Roles assigned to the user.","type":"array","items":{"type":"string"},"required":false},"password":{"description":"Password for the user (never included).","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"persisted_preferences":{"type":"object","title":"","description":"","default":[],"context":["edit"],"properties":{"_modified":{"description":"The date and time the preferences were updated.","type":"string","format":"date-time","readonly":false}},"additionalProperties":true}},"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the user.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as users do not support trashing.","required":false},"reassign":{"type":"integer","description":"Reassign the deleted user's posts and links to this user ID.","required":true}}}]},"\/wp\/v2\/users\/me":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"username":{"description":"Login name for the user.","type":"string","required":false},"name":{"description":"Display name for the user.","type":"string","required":false},"first_name":{"description":"First name for the user.","type":"string","required":false},"last_name":{"description":"Last name for the user.","type":"string","required":false},"email":{"description":"The email address for the user.","type":"string","format":"email","required":false},"url":{"description":"URL of the user.","type":"string","format":"uri","required":false},"description":{"description":"Description of the user.","type":"string","required":false},"locale":{"description":"Locale for the user.","type":"string","enum":["","en_US"],"required":false},"nickname":{"description":"The nickname for the user.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the user.","type":"string","required":false},"roles":{"description":"Roles assigned to the user.","type":"array","items":{"type":"string"},"required":false},"password":{"description":"Password for the user (never included).","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"persisted_preferences":{"type":"object","title":"","description":"","default":[],"context":["edit"],"properties":{"_modified":{"description":"The date and time the preferences were updated.","type":"string","format":"date-time","readonly":false}},"additionalProperties":true}},"required":false}}},{"methods":["DELETE"],"args":{"force":{"type":"boolean","default":false,"description":"Required to be true, as users do not support trashing.","required":false},"reassign":{"type":"integer","description":"Reassign the deleted user's posts and links to this user ID.","required":true}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/users\/me"}]}},"\/wp\/v2\/users\/(?P<user_id>(?:[\\d]+|me))\/application-passwords":{"namespace":"wp\/v2","methods":["GET","POST","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"app_id":{"description":"A UUID provided by the application to uniquely identify it. It is recommended to use an UUID v5 with the URL or DNS namespace.","type":"string","oneOf":[{"type":"string","format":"uuid"},{"type":"string","enum":[""]}],"required":false},"name":{"description":"The name of the application password.","type":"string","minLength":1,"pattern":".*\\S.*","required":true}}},{"methods":["DELETE"],"args":[]}]},"\/wp\/v2\/users\/(?P<user_id>(?:[\\d]+|me))\/application-passwords\/introspect":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/users\/(?P<user_id>(?:[\\d]+|me))\/application-passwords\/(?P<uuid>[\\w\\-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"app_id":{"description":"A UUID provided by the application to uniquely identify it. It is recommended to use an UUID v5 with the URL or DNS namespace.","type":"string","oneOf":[{"type":"string","format":"uuid"},{"type":"string","enum":[""]}],"required":false},"name":{"description":"The name of the application password.","type":"string","minLength":1,"pattern":".*\\S.*","required":false}}},{"methods":["DELETE"],"args":[]}]},"\/wp\/v2\/comments":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to comments published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to comments assigned to specific user IDs. Requires authorization.","type":"array","items":{"type":"integer"},"required":false},"author_exclude":{"description":"Ensure result set excludes comments assigned to specific user IDs. Requires authorization.","type":"array","items":{"type":"integer"},"required":false},"author_email":{"default":null,"description":"Limit result set to that from a specific author email. Requires authorization.","format":"email","type":"string","required":false},"before":{"description":"Limit response to comments published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by comment attribute.","type":"string","default":"date_gmt","enum":["date","date_gmt","id","include","post","parent","type"],"required":false},"parent":{"default":[],"description":"Limit result set to comments of specific parent IDs.","type":"array","items":{"type":"integer"},"required":false},"parent_exclude":{"default":[],"description":"Ensure result set excludes specific parent IDs.","type":"array","items":{"type":"integer"},"required":false},"post":{"default":[],"description":"Limit result set to comments assigned to specific post IDs.","type":"array","items":{"type":"integer"},"required":false},"status":{"default":"approve","description":"Limit result set to comments assigned a specific status. Requires authorization.","type":"string","required":false},"type":{"default":"comment","description":"Limit result set to comments assigned a specific type. Requires authorization.","type":"string","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST"],"args":{"author":{"description":"The ID of the user object, if author was a user.","type":"integer","required":false},"author_email":{"description":"Email address for the comment author.","type":"string","format":"email","required":false},"author_ip":{"description":"IP address for the comment author.","type":"string","format":"ip","required":false},"author_name":{"description":"Display name for the comment author.","type":"string","required":false},"author_url":{"description":"URL for the comment author.","type":"string","format":"uri","required":false},"author_user_agent":{"description":"User agent for the comment author.","type":"string","required":false},"content":{"description":"The content for the comment.","type":"object","properties":{"raw":{"description":"Content for the comment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the comment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"date":{"description":"The date the comment was published, in the site's timezone.","type":"string","format":"date-time","required":false},"date_gmt":{"description":"The date the comment was published, as GMT.","type":"string","format":"date-time","required":false},"parent":{"default":0,"description":"The ID for the parent of the comment.","type":"integer","required":false},"post":{"default":0,"description":"The ID of the associated post object.","type":"integer","required":false},"status":{"description":"State of the comment.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_wp_note_status":{"type":"string","title":"","description":"Note resolution status","default":"","enum":["resolved","reopen"]}},"required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/comments"}]}},"\/wp\/v2\/comments\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the comment.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the parent post of the comment (if the post is password protected).","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the comment.","type":"integer","required":false},"author":{"description":"The ID of the user object, if author was a user.","type":"integer","required":false},"author_email":{"description":"Email address for the comment author.","type":"string","format":"email","required":false},"author_ip":{"description":"IP address for the comment author.","type":"string","format":"ip","required":false},"author_name":{"description":"Display name for the comment author.","type":"string","required":false},"author_url":{"description":"URL for the comment author.","type":"string","format":"uri","required":false},"author_user_agent":{"description":"User agent for the comment author.","type":"string","required":false},"content":{"description":"The content for the comment.","type":"object","properties":{"raw":{"description":"Content for the comment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the comment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"date":{"description":"The date the comment was published, in the site's timezone.","type":"string","format":"date-time","required":false},"date_gmt":{"description":"The date the comment was published, as GMT.","type":"string","format":"date-time","required":false},"parent":{"description":"The ID for the parent of the comment.","type":"integer","required":false},"post":{"description":"The ID of the associated post object.","type":"integer","required":false},"status":{"description":"State of the comment.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_wp_note_status":{"type":"string","title":"","description":"Note resolution status","default":"","enum":["resolved","reopen"]}},"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the comment.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"password":{"description":"The password for the parent post of the comment (if the post is password protected).","type":"string","required":false}}}]},"\/wp\/v2\/search":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"type":{"default":"post","description":"Limit results to items of an object type.","type":"string","enum":["post","term","post-format"],"required":false},"subtype":{"default":"any","description":"Limit results to items of one or more object subtypes.","type":"array","items":{"enum":["post","page","project","wprss_feed_item","category","post_tag","project_category","project_tag","gallery_categories","any"],"type":"string"},"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/search"}]}},"\/wp\/v2\/block-renderer\/(?P<name>[a-z0-9-]+\/[a-z0-9-]+)":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET","POST"],"args":{"name":{"description":"Unique registered name for the block.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["edit"],"default":"view","required":false},"attributes":{"description":"Attributes for the block.","type":"object","default":[],"required":false},"post_id":{"description":"ID of the post context.","type":"integer","required":false}}}]},"\/wp\/v2\/block-types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"namespace":{"description":"Block namespace.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/block-types"}]}},"\/wp\/v2\/block-types\/(?P<namespace>[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"namespace":{"description":"Block namespace.","type":"string","required":false}}}]},"\/wp\/v2\/block-types\/(?P<namespace>[a-zA-Z0-9_-]+)\/(?P<name>[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"description":"Block name.","type":"string","required":false},"namespace":{"description":"Block namespace.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/settings":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"title":{"title":"Title","description":"Site title.","type":"string","required":false},"description":{"title":"Tagline","description":"Site tagline.","type":"string","required":false},"url":{"title":"","description":"Site URL.","type":"string","format":"uri","required":false},"email":{"title":"","description":"This address is used for admin purposes, like new user notification.","type":"string","format":"email","required":false},"timezone":{"title":"","description":"A city in the same timezone as you.","type":"string","required":false},"date_format":{"title":"","description":"A date format for all date strings.","type":"string","required":false},"time_format":{"title":"","description":"A time format for all time strings.","type":"string","required":false},"start_of_week":{"title":"","description":"A day number of the week that the week should start on.","type":"integer","required":false},"language":{"title":"","description":"WordPress locale code.","type":"string","required":false},"use_smilies":{"title":"","description":"Convert emoticons like :-) and :-P to graphics on display.","type":"boolean","required":false},"default_category":{"title":"","description":"Default post category.","type":"integer","required":false},"default_post_format":{"title":"","description":"Default post format.","type":"string","required":false},"posts_per_page":{"title":"Maximum posts per page","description":"Blog pages show at most.","type":"integer","required":false},"show_on_front":{"title":"Show on front","description":"What to show on the front page","type":"string","required":false},"page_on_front":{"title":"Page on front","description":"The ID of the page that should be displayed on the front page","type":"integer","required":false},"page_for_posts":{"title":"","description":"The ID of the page that should display the latest posts","type":"integer","required":false},"default_ping_status":{"title":"","description":"Allow link notifications from other blogs (pingbacks and trackbacks) on new articles.","type":"string","enum":["open","closed"],"required":false},"default_comment_status":{"title":"Allow comments on new posts","description":"Allow people to submit comments on new posts.","type":"string","enum":["open","closed"],"required":false},"site_logo":{"title":"Logo","description":"Site logo.","type":"integer","required":false},"site_icon":{"title":"Icon","description":"Site icon.","type":"integer","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/settings"}]}},"\/wp\/v2\/themes":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"status":{"description":"Limit result set to themes assigned one or more statuses.","type":"array","items":{"enum":["active","inactive"],"type":"string"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/themes"}]}},"\/wp\/v2\/themes\/(?P<stylesheet>[^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"stylesheet":{"description":"The theme's stylesheet. This uniquely identifies the theme.","type":"string","required":false}}}]},"\/wp\/v2\/plugins":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"status":{"description":"Limits results to plugins with the given status.","type":"array","items":{"type":"string","enum":["inactive","active"]},"required":false}}},{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","pattern":"[\\w\\-]+","required":true},"status":{"description":"The plugin activation status.","type":"string","enum":["inactive","active"],"default":"inactive","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/plugins"}]}},"\/wp\/v2\/plugins\/(?P<plugin>[^.\\\/]+(?:\\\/[^.\\\/]+)?)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false},"status":{"description":"The plugin activation status.","type":"string","enum":["inactive","active"],"required":false}}},{"methods":["DELETE"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false}}}]},"\/wp\/v2\/sidebars":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/sidebars"}]}},"\/wp\/v2\/sidebars\/(?P<id>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a registered sidebar","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"widgets":{"description":"Nested widgets.","type":"array","items":{"type":["object","string"]},"required":false}}}]},"\/wp\/v2\/widget-types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/widget-types"}]}},"\/wp\/v2\/widget-types\/(?P<id>[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The widget type id.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/widget-types\/(?P<id>[a-zA-Z0-9_-]+)\/encode":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"The widget type id.","type":"string","required":true},"instance":{"description":"Current instance settings of the widget.","type":"object","required":false},"form_data":{"description":"Serialized widget form data to encode into instance settings.","type":"string","required":false}}}]},"\/wp\/v2\/widget-types\/(?P<id>[a-zA-Z0-9_-]+)\/render":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"The widget type id.","type":"string","required":true},"instance":{"description":"Current instance settings of the widget.","type":"object","required":false}}}]},"\/wp\/v2\/widgets":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"sidebar":{"description":"The sidebar to return widgets for.","type":"string","required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the widget.","type":"string","required":false},"id_base":{"description":"The type of the widget. Corresponds to ID in widget-types endpoint.","type":"string","required":false},"sidebar":{"default":"wp_inactive_widgets","description":"The sidebar the widget belongs to.","type":"string","required":true},"instance":{"description":"Instance settings of the widget, if supported.","type":"object","properties":{"encoded":{"description":"Base64 encoded representation of the instance settings.","type":"string","context":["edit"]},"hash":{"description":"Cryptographic hash of the instance settings.","type":"string","context":["edit"]},"raw":{"description":"Unencoded instance settings, if supported.","type":"object","context":["edit"]}},"required":false},"form_data":{"description":"URL-encoded form data from the widget admin form. Used to update a widget that does not support instance. Write only.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/widgets"}]}},"\/wp\/v2\/widgets\/(?P<id>[\\w\\-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the widget.","type":"string","required":false},"id_base":{"description":"The type of the widget. Corresponds to ID in widget-types endpoint.","type":"string","required":false},"sidebar":{"description":"The sidebar the widget belongs to.","type":"string","required":false},"instance":{"description":"Instance settings of the widget, if supported.","type":"object","properties":{"encoded":{"description":"Base64 encoded representation of the instance settings.","type":"string","context":["edit"]},"hash":{"description":"Cryptographic hash of the instance settings.","type":"string","context":["edit"]},"raw":{"description":"Unencoded instance settings, if supported.","type":"object","context":["edit"]}},"required":false},"form_data":{"description":"URL-encoded form data from the widget admin form. Used to update a widget that does not support instance. Write only.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"force":{"description":"Whether to force removal of the widget, or move it to the inactive sidebar.","type":"boolean","required":false}}}]},"\/wp\/v2\/block-directory\/search":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"term":{"description":"Limit result set to blocks matching the search term.","type":"string","minLength":1,"required":true}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/block-directory\/search"}]}},"\/wp\/v2\/pattern-directory\/patterns":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":100,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","minLength":1,"required":false},"category":{"description":"Limit results to those matching a category ID.","type":"integer","minimum":1,"required":false},"keyword":{"description":"Limit results to those matching a keyword ID.","type":"integer","minimum":1,"required":false},"slug":{"description":"Limit results to those matching a pattern (slug).","type":"array","required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","favorite_count"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/pattern-directory\/patterns"}]}},"\/wp\/v2\/block-patterns\/patterns":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/block-patterns\/patterns"}]}},"\/wp\/v2\/block-patterns\/categories":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/block-patterns\/categories"}]}},"\/wp-site-health\/v1":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-site-health\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp-site-health\/v1"}]}},"\/wp-site-health\/v1\/tests\/background-updates":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp-site-health\/v1\/tests\/background-updates"}]}},"\/wp-site-health\/v1\/tests\/loopback-requests":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp-site-health\/v1\/tests\/loopback-requests"}]}},"\/wp-site-health\/v1\/tests\/https-status":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp-site-health\/v1\/tests\/https-status"}]}},"\/wp-site-health\/v1\/tests\/dotorg-communication":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp-site-health\/v1\/tests\/dotorg-communication"}]}},"\/wp-site-health\/v1\/tests\/authorization-header":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp-site-health\/v1\/tests\/authorization-header"}]}},"\/wp-site-health\/v1\/directory-sizes":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp-site-health\/v1\/directory-sizes"}]}},"\/wp-site-health\/v1\/tests\/page-cache":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp-site-health\/v1\/tests\/page-cache"}]}},"\/wp-block-editor\/v1":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-block-editor\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp-block-editor\/v1"}]}},"\/wp-block-editor\/v1\/url-details":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"The URL to process.","type":"string","format":"uri","required":true}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp-block-editor\/v1\/url-details"}]}},"\/wp\/v2\/menu-locations":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/menu-locations"}]}},"\/wp\/v2\/menu-locations\/(?P<location>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"location":{"description":"An alphanumeric identifier for the menu location.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp-block-editor\/v1\/export":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp-block-editor\/v1\/export"}]}},"\/wp-block-editor\/v1\/navigation-fallback":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp-block-editor\/v1\/navigation-fallback"}]}},"\/wp\/v2\/font-collections":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/font-collections"}]}},"\/wp\/v2\/font-collections\/(?P<slug>[\\\/\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp-abilities\/v1":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-abilities\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp-abilities\/v1"}]}},"\/wp-abilities\/v1\/categories":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":50,"minimum":1,"maximum":100,"required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp-abilities\/v1\/categories"}]}},"\/wp-abilities\/v1\/categories\/(?P<slug>[a-z0-9]+(?:-[a-z0-9]+)*)":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"Unique identifier for the ability category.","type":"string","pattern":"^[a-z0-9]+(?:-[a-z0-9]+)*$","required":false}}}]},"\/wp-abilities\/v1\/abilities\/(?P<name>[a-zA-Z0-9\\-\\\/]+?)\/run":{"namespace":"wp-abilities\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":{"name":{"description":"Unique identifier for the ability.","type":"string","pattern":"^[a-zA-Z0-9\\-\\\/]+$","required":false},"input":{"description":"Input parameters for the ability execution.","type":["integer","number","boolean","string","array","object","null"],"default":null,"required":false}}}]},"\/wp-abilities\/v1\/abilities":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":50,"minimum":1,"maximum":100,"required":false},"category":{"description":"Limit results to abilities in specific ability category.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/builtintelligence.com\/wp-json\/wp-abilities\/v1\/abilities"}]}},"\/wp-abilities\/v1\/abilities\/(?P<name>[a-zA-Z0-9\\-\\\/]+)":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"description":"Unique identifier for the ability.","type":"string","pattern":"^[a-zA-Z0-9\\-\\\/]+$","required":false}}}]}},"site_logo":0,"site_icon":1266,"site_icon_url":"https:\/\/builtintelligence.com\/wp-content\/uploads\/2025\/11\/Fav-Icon.png","_links":{"help":[{"href":"https:\/\/developer.wordpress.org\/rest-api\/"}],"wp:featuredmedia":[{"embeddable":true,"type":"site_icon","href":"https:\/\/builtintelligence.com\/wp-json\/wp\/v2\/media\/1266"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}