APC Competencies – Inclusive Environments by Jen Lemen
In this article, we look at five key topics relevant to the Inclusive Environments competency. This is a level 1 mandatory competency on all pathways, so it is essential reading for RICS APC candidates.
What is an inclusive environment?
In their Essential Principles guide, the Construction Industry Council (CIC) define an inclusive environment as ‘one that can be accessed and used safely, easily and with dignity by everyone’, ‘does not physically or socially segregate, discriminate or isolate’ and ‘is well designed, functional, efficient and sustainable, and delivers an enhanced user experience’.
What is inclusive design?
In the CABE guide, ‘The Principles of Inclusive Design’, inclusive design is defined as ‘making places everyone can use’. This removes barriers creating undue effort and separation, enabling all users to ‘participate equally, confidently and independently in everyday environments’.
What are the key principles of inclusive design?
The CIC set out five key principles for inclusive design:
- Placing people at the heart of the design process
- Acknowledging diversity and difference
- Offering choice where a single solution cannot accommodate all users
- Providing flexibility in use
- Creating an environment that is convenient and enjoyable for all to use
How can inclusive design be achieved?
In this article, we are going to consider five key topics relating to inclusive environments and design:
- Equality Act 2010
- National Planning Policy Framework (NPPF)
- Approved Document M
- British Standard BS 8300
- Changing Places campaign
What does the Equality Act 2010 say about inclusive environments?
The Equality Act 2010 replaced the Disability Discrimination Acts of 1995 and 2005. Section 20 states that disabled individuals should not face barriers to access premises. If a barrier is faced and the disabled individual is put at a substantial disadvantage in relation to a non-disabled individual, then the service provider is under an obligation to make reasonable adjustments to facilitate access.
This extends beyond the duty just to facilitate physical access, e.g. through ramps or lift access. It also relates to the way in which services are provided, which could include auxiliary aids such as hearing loops or visual aids.
Reasonable adjustments can be made through changing the way that things are done, changing physical features or providing additional aids or services.
You can read more about reasonable adjustments here.
What does the NPPF say about inclusive environments?
Section 8 of the latest NPPF relates to the provision of healthy, inclusive and safe places. These should ‘promote health and well-being, with a high standard of amenity for existing and future users’. This emphasises that high quality, inclusive design is a key principle of sustainable development, going beyond just aesthetic factors.
What is Approved Document M of the Building Regulations?
Approved Document M relates to the ‘ease of access to, and use of, buildings, including facilities for disabled visitors or occupants, and the ability to move through a building easily including to toilets and bathrooms’. It is split into Volume 1 Dwellings and Volume 2 Buildings other than Dwellings.
You can read the full guidance in Approved Document M here.
What is BS 8300?
BS 8300 was introduced in 2018, split into two parts; Part 1 BS 8300-1:2018 and Part 2 BS 8300-2:2018. BS 8300 goes beyond the minimum requirements set out in the Approved Document Part M.
Part 1 provides guidance relating to the accessible and inclusive design of new public spaces. Part 2 relates to internal design to meet all user requirements. It does not apply to individual residential dwellings.
The guidance relates to issues such as lighting external areas, ramp gradients and rises, accessible viewing for audience seating, sanitary facilities, WC layout and baby change facilities.
You can access the full guidance on the BSI website.
What is the Changing Places campaign?
The Changing Places campaign was launched in 2006 by the Changing Places Consortium. It aims to provide toilet facilities which are safe, comfortable and accessible for those who cannot use standard accessible toilets.
Changing Places toilets will have adequate space and facilities, e.g. height adjustable changing benches and hoists, to meet a variety of user requirements. Research suggests that over 250,000 people in the UK would benefit from the provision of Changing Places toilets, including users living with motor neurone disease, multiple sclerosis and cerebral palsy.
How can I learn more?
We highly recommend checking out the free CPD module (1 hour) offered by the Design Council, which can be accessed here. The Design Council also offer an extensive Resource Hub online.
Introducing the Public Works Academy
Mastering Public Works Contracts: A Smarter Way to Build Capability Across Your Team In today’s construction landscape, understanding contract frameworks isn’t just beneficial; it’s essential. Nowhere is this more apparent than in Ireland, where Public Works Contracts (PWCs) form the mandatory foundation for delivering publicly funded infrastructure projects. Yet, for many professionals, navigating these contracts can feel complex, technical, and at times overwhelming. That’s exactly where the Public Works Contract (PWC) Academy comes in. Why Public Works Contracts Matter Public Works Contracts sit at the heart of Ireland’s Capital Works Management Framework (CWMF), governing how public projects are procured, managed, and delivered. A solid understanding of...
Early Warnings In NEC4: Why They Still Come In Too Late
Who is this for? This guide is for professionals working on NEC4 Engineering and Construction Contracts for the first time, or those looking to strengthen their understanding of the early warning process in practice. It is particularly relevant to: Project managers and contract administrators Contractors and commercial managers Clients and client-side teams Subcontractors and supply chain professionals supporting delivery under NEC4 contracts What you will learn This guide provides a working understanding of: What an early warning is and why it exists Who is obliged to give early warnings and when How the Early Warning Register works in practice What happens at an early warning meeting The difference between an early warning and a Compensation Event The commercial consequences of failing...
Why I Joined Built Intelligence and What I’ll Be Writing About
Genna Rourke joined Built Intelligence as Industry Engagement Director in January 2026. With nearly twenty years’ experience across quantity surveying and commercial leadership, Genna brings first-hand industry perspective to our work across FastDraft, Academy and wider thought leadership. In this new series, she will share practical views on the challenges construction teams face in contract management, capability development and commercial control. Hello. Here’s who I am and why I’m writing. I joined Built Intelligence in January 2026 as Industry Engagement Director. Before that, I spent nearly twenty years working as a quantity surveyor and commercial leader across infrastructure, civil engineering and contractor environments. I am a Chartered QS, MRICS and FCInstCES,...