APC Competencies – Inclusive Environments by Jen Lemen

In this article, we look at five key topics relevant to the Inclusive Environments competency. This is a level 1 mandatory competency on all pathways, so it is essential reading for RICS APC candidates.

What is an inclusive environment?

In their Essential Principles guide, the Construction Industry Council (CIC) define an inclusive environment as ‘one that can be accessed and used safely, easily and with dignity by everyone’, ‘does not physically or socially segregate, discriminate or isolate’ and ‘is well designed, functional, efficient and sustainable, and delivers an enhanced user experience’.

What is inclusive design?

In the CABE guide, ‘The Principles of Inclusive Design’, inclusive design is defined as ‘making places everyone can use’. This removes barriers creating undue effort and separation, enabling all users to ‘participate equally, confidently and independently in everyday environments’.

What are the key principles of inclusive design?

The CIC set out five key principles for inclusive design:

  • Placing people at the heart of the design process
  • Acknowledging diversity and difference
  • Offering choice where a single solution cannot accommodate all users
  • Providing flexibility in use
  • Creating an environment that is convenient and enjoyable for all to use

How can inclusive design be achieved?

In this article, we are going to consider five key topics relating to inclusive environments and design:

  1. Equality Act 2010
  2. National Planning Policy Framework (NPPF)
  3. Approved Document M
  4. British Standard BS 8300
  5. Changing Places campaign

What does the Equality Act 2010 say about inclusive environments?

The Equality Act 2010 replaced the Disability Discrimination Acts of 1995 and 2005. Section 20 states that disabled individuals should not face barriers to access premises. If a barrier is faced and the disabled individual is put at a substantial disadvantage in relation to a non-disabled individual, then the service provider is under an obligation to make reasonable adjustments to facilitate access.

This extends beyond the duty just to facilitate physical access, e.g. through ramps or lift access. It also relates to the way in which services are provided, which could include auxiliary aids such as hearing loops or visual aids. 
Reasonable adjustments can be made through changing the way that things are done, changing physical features or providing additional aids or services.

You can read more about reasonable adjustments here.

What does the NPPF say about inclusive environments?

Section 8 of the latest NPPF relates to the provision of healthy, inclusive and safe places. These should ‘promote health and well-being, with a high standard of amenity for existing and future users’. This emphasises that high quality, inclusive design is a key principle of sustainable development, going beyond just aesthetic factors.

What is Approved Document M of the Building Regulations?

Approved Document M relates to the ‘ease of access to, and use of, buildings, including facilities for disabled visitors or occupants, and the ability to move through a building easily including to toilets and bathrooms’. It is split into Volume 1 Dwellings and Volume 2 Buildings other than Dwellings.

You can read the full guidance in Approved Document M here.

What is BS 8300?

BS 8300 was introduced in 2018, split into two parts; Part 1 BS 8300-1:2018 and Part 2 BS 8300-2:2018. BS 8300 goes beyond the minimum requirements set out in the Approved Document Part M.

Part 1 provides guidance relating to the accessible and inclusive design of new public spaces. Part 2 relates to internal design to meet all user requirements. It does not apply to individual residential dwellings.

The guidance relates to issues such as lighting external areas, ramp gradients and rises, accessible viewing for audience seating, sanitary facilities, WC layout and baby change facilities.

You can access the full guidance on the BSI website.

What is the Changing Places campaign?

The Changing Places campaign was launched in 2006 by the Changing Places Consortium. It aims to provide toilet facilities which are safe, comfortable and accessible for those who cannot use standard accessible toilets.

Changing Places toilets will have adequate space and facilities, e.g. height adjustable changing benches and hoists, to meet a variety of user requirements. Research suggests that over 250,000 people in the UK would benefit from the provision of Changing Places toilets, including users living with motor neurone disease, multiple sclerosis and cerebral palsy.

How can I learn more?

We highly recommend checking out the free CPD module (1 hour) offered by the Design Council, which can be accessed here. The Design Council also offer an extensive Resource Hub online.

5 Apr, 2024
Why I Joined Built Intelligence and What I’ll Be Writing About

Why I Joined Built Intelligence and What I’ll Be Writing About

Genna Rourke joined Built Intelligence as Industry Engagement Director in January 2026. With nearly twenty years’ experience across quantity surveying and commercial leadership, Genna brings first-hand industry perspective to our work across FastDraft, Academy and wider thought leadership. In this new series, she will share practical views on the challenges construction teams face in contract management, capability development and commercial control.   Hello. Here’s who I am and why I’m writing.   I joined Built Intelligence in January 2026 as Industry Engagement Director. Before that, I spent nearly twenty years working as a quantity surveyor and commercial leader across infrastructure, civil engineering and contractor environments. I am a Chartered QS, MRICS and FCInstCES,...

read more
FastDraft: Setting up NEC contracts for success

FastDraft: Setting up NEC contracts for success

The early days of an NEC contract set the tone for everything that follows. Yet, on many projects, the first 90 days are where discipline slips, processes drift, and risk quietly builds. Teams attend training. They understand the contract. They start with good intentions. But as delivery pressures increase, the gap between what people know and what they actually do begins to widen. That gap is where projects lose control. FastDraft closes it. By embedding structure, prompts and accountability directly into the workflow, it turns NEC knowledge into consistent, repeatable behaviour from day one.   Behaviour vs documentation   NEC contracts are designed around proactive management, clear communication and strict timescales. Success depends less on what is written and more on how...

read more
5 things you need to do in the first 90 days of your NEC Contract

5 things you need to do in the first 90 days of your NEC Contract

When it comes to NEC contracts, the first few weeks of a project set the tone for the entire delivery. Many disputes, delays, and unnecessary costs originate not from technical complexity but from overlooked processes, unclear roles, and poor documentation right at the start. NEC4 is designed for proactive management. If you treat it like a traditional contract and “sort it out later”, you risk compounding small issues into major problems.Small Mistakes, Big Consequences Early inconsistencies in NEC4 contracts can escalate quickly. Common examples include: Incomplete Contract Data – Missing dates, unclear roles, or unvalidated options can cause confusion when a time-critical decision arises. Uncoordinated Scope / Works Information – Ambiguities in what needs delivering often surface as...

read more